MB2 Motorsports & MAX Construction Services
Team Up Again

Jay Frye's vision to transform
an abandoned manufacturing facility
into a modern race team facility
is completed in 2005

05390Pictures9-16-05to10-20-05023.jpg

MB2 Motorsports moved into thier new Facility
in the fall of 2005   

05390Pictures9-16-05to10-20-05027.jpg

Fan's Viewing Area

MB2's newly renovated 145,000 sf facility.
MAX Construction Services partnered with MB2 from conception to completion....transforming a manufacturing building to a modern race facility.

1111.bmp

MB2's Lobby

Offices were demolished, utilities moved, ceilings raised & concrete walls removed to make way for racing fans.

05390Pictures9-16-05to10-20-05052.jpg

Car Hauler Ramp

The original 4ft high loading dock was totally rebuilt.
Structural support steel was added & strengthened so that the new 14x16 doors could be installed.
Rain leaders & storm water drains were relocated, concrete retaining walls installed & a new concete ramp was poured.

MB2PaintShop.bmp

MB2's Paint Shop

(3) new prep stations with paint boothes

MB2FabShop1.bmp

MB2's Fab Shop

This area was totaly rebuilt.
All new electrical transformers, panels,
conduit, receptacles & lighting
Relocated & new HVAC equipment
Walls & ceilings blasted & painted
Floors were blasted, patched and coated